1.Reduce max working pressure of boiler
2.Change the safety valve to larger size diameter
If you change the safety valve then need to increase corresponding waste pipe dia and also safety valve cut chest cut size need to be increased
Option 2 is bit complicated so we go for option 3.
3.Reduce the firing rate by following
- Change the nozzle
- Dp transmitter need to be recalliberated
- Steam cut in/ cut off will as per new max working pressure
- Set the safety valve for new max working pressure
- Accumulation pressure test to be done in presence of surveyor